← All research teams
CROs

Experiment design for contract research organizations

Give sponsors and delivery teams the same view of the study before anyone commits time or materials.

Two analytical researchers compare inert reference tiles

Start with the decision your team needs to make

A good sponsor brief has to survive three handoffs. Business development needs a defensible scope, study scientists need a design they can interpret, and the sponsor needs to know what the deliverable will support. Use Shadow AI to turn the brief into a study plan with shared assumptions about endpoints, sites, and review gates before the quote is settled.

Studies your team can review together

Separate site differences from setting differences

Two sites report different readings for the same inert reference material. If each site uses a different measurement setting, the reason for the difference remains unresolved. Give the sponsor the two questions separately. One concerns transfer under the agreed setup. The other concerns whether the setting drives a meaningful change.

Tie the estimate to what the sponsor receives

Compare a scope that supports an exploratory estimate with one that can address a predefined acceptance range. Make independent runs and repeat readings visible in both. Put the implications for scheduling, interpretation, and the final report in the same review.

Keep the handoff clear when the scope changes

Identify the parts of the design affected by a change in sites, instruments, primary comparison, or acceptance criteria. Save the revised assumptions with the design for the delivery team. That gives the sponsor a concrete way to see which parts of the original decision the new study can still support.

From the first question to design review

  1. Convert the scope into a study brief

    Capture the endpoints, sponsor requirements, budget, and acceptance criteria alongside the design question.

  2. Review cost and interpretation together

    Make the independent runs, repeated readings, and site constraints explicit so the sponsor can see what the design can answer.

  3. Hand off the agreed design

    Export a shared plan with the scope, protocol, and analysis assumptions so delivery and reporting start from the same decisions.

Pilot from sponsor brief to signed-off study plan

  1. Select a de-identified statement of work for a two-site measurement study. Capture the acceptance question, planned deliverables, and constraints already agreed with the sponsor.
  2. Generate a design draft. Let the scientific liaison and delivery lead independently identify scope ambiguities, assumptions, and planning decisions.
  3. Review one proposed scope change, such as losing access to an instrument or adding a site. Record whether it alters the primary comparison, interpretation, run estimate, or review timeline.
  4. Export the final proposal and compare it with the team's usual handoff. Ask the sponsor-facing reviewer which decisions still require clarification.

How to judge the pilot

  • Time from usable sponsor brief to internally reviewed study draft
  • Unresolved scope or interpretation questions at handoff
  • Requested runs with a clear link to a sponsor decision

Questions teams ask

When should a sponsor define the acceptance range?

Define it during scoping, before anyone sees study results. Agree on the difference the sponsor would tolerate and record how the analysis will compare the estimate and uncertainty with that range.

What if a site cannot use the same setup as the others?

Record which site and setting combinations are feasible. Ask the reviewer which comparisons can still be made, where interpretation is limited, and whether the sponsor should narrow or revise the question before work starts.

Who should review the draft before it reaches the sponsor?

Have the scientific liaison review the decision and commitments, the delivery lead review the run assumptions, and the analyst check whether the planned data can answer the primary question. Use the exported plan as the shared review document.

Try it on a study you already understand

A sponsor review should be able to trace each endpoint to a decision and each requested run to the scope.

DOE field guide

DOE for analytical method transfer: a practical CRO guide

Plan a method transfer DOE that separates site effects from method settings and gives sponsors an interpretable study handoff.